Repeat step 18 to install the outer shower door panel into the outer door channel with the towel bar handle facing outward.
How to install a shower door latch.
Mine has 2 screws with a white nylon or plastic catch that clicks.
Installing the door panels is easiest from outside the shower.
Installing a shower door is usually a very straightforward project.
Learning how to install a shower door is simply a matter of the right tools and good technique.
Top shower door brands delta.
Install the door handles that come with the kit.
I bought my latch at one of these stores as it was failing to keep door closed at showertime.
When installing or replacing they recommends that you make sure to.
Unlike installing pulls or handles on wooden cabinets inner and outer handles are aligned to predrilled installation holes in the door then attached to each other.
Hanging the door panels.
For the frame you ll need to install tracks at the bottom sides and top of your shower opening using sealant and screws.
Take a close up picture and show your camera photo to the clerk at the store.
Go to store that sells shower doors.
Prepare the doors by installing roller and if applicable handle towel bar hardware.
Most pivot doors are designed to be reversible and can be installed with the pivots on the right or left side of the enclosure.
Read all warnings care and maintenance information.
Replacing knobs handles or pulls on a frameless glass shower door is a simple project that can be completed in minutes.
Align the outside door handle with the holes in the doorframe.
Attach the interior handle and tighten the setscrews.
Purchase the correct water supply components.
Swinging shower doors are held in place using a magnet set in the latch of the door.
Place the rollers on the top frame flange of both door panels and secure them with lock washers and machine screws.
The installation process will vary depending on whether you re installing a swinging or sliding glass door but either way you ll need to start by assembling a frame for the door.
Stabilize the assembly by drilling a pilot hole and driving a inch screw through the outside face of the base track wherever it meets a vertical frame member.
Read all the instructions completely before beginning.
Step 20 install the door bumpers in the vertical track channels by snapping the bumper tabs into the predrilled holes in the channels.
If your shower door is swinging open it might be time to replace the magnet inside of the latch.
When the door closes the magnet adheres to the metal surface of the shower frame and keeps the door closed.