The flashing should overlap the edge of the roof by one inch to help direct.
How to install r panel roofing.
It s ideal for retro fitting over existing composition shingles and it saves time labor and disposal costs which means a lower total project cost.
The r panel is recommended for use on side walls only.
This means that the minimum roof slope required for all panels is 1 inches of rise per foot.
Drive through the outside closure and the ribs of the panel beneath.
Next put a screw into the fastening strip to keep it steady before installing the screws along the face.
The r panel is a low maintenance durable metal roofing alternative to conventional roofing.
Moreover try to ensure that the screws are all aligned evenly.
And for any exposed fasteners try to avoid over tightening them.
It helps direct water away from the.
See panel squaring method in this manual.
Flashing is metal trim that fits over joints where two sections of roof meet.
Choose from many designer colors for a sleek attractive appearance.
Bend the flashing into a v shape to fit over the top roof ridge and the corners where the panels meet.
5 outside closure install along upper edge of panels about 2 below the edge.
The ir panel is used on side walls only.
Install the roof substrate according to local building code requirements.
Install the panel a minimum of 3 up from the water diverter at the bottom of the valley and minimum of 3 down from the top of the valley.
R panel requires a minimum pitch of 1 12.
You will use metal roofing screws to secure the metal panels to the sheathing.
Preformed valley trim panel wood screw panel.
To prevent corrosion immediately remove any loose metal shavings left on roof surface.
3 roofing panel install with lower edge overhanging eave edge by at least 1.
Roof pitch our roofing panels require a certain degree of pitch to ensure proper water drainage.
After installing roof remove any debris such as.
Now we can install our roof panels.
Along the fastening strip of the sl16 always use the pancake head fastener.
As a general principle the less steep the.
Try to space the screws about 12 inches apart down the entire piece of metal.