Installing the rolled roofing 1.
How to install roll shingle roofing.
To seal a plumbing vent spread roofing.
Use a trowel to scoop up the roofing cement.
Cut the rolled roofing.
Repeat this on both sides of the roof.
How to do it attach first course.
Nail it in place with roofing nails that penetrate at least 3 4 inch into.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Install peel and stick roofing in a similar manner.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
The strips should always be horizontal.
Mark a chalk line to identify the end of your first layer.
For extra durability you may install roll roofing in two layers.
Apply roofing cement to the roof.
Spread the roofing cement along the.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the valley.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Every 5 inches make a new mark until you get to the rop of the roof.
It also helps if you first install a layer of roofing felt.
Drip edge or drip cap is either plastic or sheet metal.
Using a measuring tape measure 35 inches 89 cm up from.