Step 3 cover the old shingles.
How to install roof shingles over old shingles.
Damaged decking will need to be repaired before you can install any new shingles.
The felt should be secured every six inches with nails or staples.
Damaged shingles should be removed to check the decking for problems.
Each shingle will require around 4 nails underneath the tar line and about half an inch under where the next shingle will overlap.
To lay out the design for the shingles begin at the bottom of the roof and place a tape measure inch from the edge of the roof to ensure the shingles overhang the drip edge.
Do both sides first and then install ridge cap shingles over the top.
Attach with nails along the top edge of the strip.
Re roofers have tricks to lay new roof shingles over old so that the same step ups between courses are maintained but if any old shingles are cupped curled or otherwise misshapen those defects will telegraph through to the new layer.
Rip cut the starter strip or starter pieces so that they butt up against the second course of existing shingles and are even with the front edge of the existing roofing.
All shingle manufacturers honor the warranty whether their products are used for a reroof or a new roof.
The first row of shingles should overhang the drip edge of the roof.
Install a layer of roofing felt over the roof before you begin installing the new shingles.
Handy home shows you universal shingling techniques that can be applied to any shed.
Do this on both sides of the roof.
Mark 12 inches up on the roof for the first course of shingles then mark every 5 inches all the way up the roof to set your reveal.
Around an inch should do.
Many roofers recommend using laminated or dimensional shingles for re roofs because they re thicker than.
Because asphalt shingles are routinely exposed 5 in rip down the first strip the starter course so that it is 5 in.
Shingling a shed and want some tips.
To level out an existing asphalt shingle roof rip down reduce the height of two courses of shingles as shown in the drawing below.
Leave the old valley flashing in place and install new over it.