Begin at the bottom corner of one side of the structure.
Installing metal siding for shed exterior.
The first step to installing the siding is to determine how tall the sheets need to be.
Nail the sheet into place using the holes pre fabricated into the metal or nail the sheets to the studs according to manufacturer instructions.
The bottom edges of the sheets should extend at least one and one half inches below the bottom plate of the wall framing.
So 4 00 x 304sq ft.
You will want the top of the sheets to start at one half an inch below the top of the wall.
The low end is about 3 00 per square foot up to 6 00 per square foot for the thicker top of the line siding.
Installing the siding if you used sheathing on the shed walls the first thing you should do is add house wrap.
If finished in aluminum siding.
Another common type of vertical shed siding is t1 11 exterior siding.
Install the corner posts that came with your metal siding first.
This is a plastic that helps to keep water out.
Overlap each sheet by at least 2 inches.
Place the first siding sheet in place.
J channel is an accessory to the siding that s used to.
The corner posts are the pieces of siding that will.
Install j channel along the.
Use a razor blade to cut the wrap and nail into place with a hammer using the 1 plastic cap nails.
As you install the sheet metal siding be sure that the panels are lined up straight.
Using the same process for steel siding.
Install using manufacturer recommended corner and edge flashing and j channels.
Metal siding installation labor basic basic labor to install metal siding with favorable site conditions.
Applying the j channel 1.
Installing siding on b wall installing the t1 11 4 8 exterior siding to the framing using 1 1 4 finishing nails after makings sure the top of the sheets are flush with the top plates in addition align the sides of the sheets with great attention if you want to get a professional result.
T1 11 comes in 4 x8 panels and has channels running vertically about every 8.
Layout fabricate and attach metal siding 6 width over vapor barrier.
This is the most important step in the whole project in order to keep rain and snow from seeping under the metal siding.
Its use does not require wall sheathing and will add structural strength to your shed walls.
Cost ranges between 4 00 and 8 00.
Nail j channel along the bottom of the wall you re working on.