Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Installing rolled rubber roofing.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
To seal a plumbing vent spread roofing.
For extra durability you may install roll roofing in two layers.
Installing the rolled roofing 1.
Step 1 clean off the roof.
Puting the weather watch rolled roofing material on was real easy and fast to install.
Mark a chalk line to identify the end of your first layer.
Plan so that no two butt joints are closer than 2 feet from each other.
Before doing anything with your rubber roof take the time to thoroughly clean the roof.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
This is the type of system i like to install best one of the key strengths of a rubber roof is the lack of joints and therefore potential leaks epdm rubber membrane can be cut to virtually any size from one piece without joins up to 15m x 30m.
Cut the rolled roofing.
How to do it attach first course.
The roofing screws were 1 1 2 inch and went thru the drip edge and into the stud below.
Installing an epdm rubber roof.
This aluminum flashing protects the edges of the roof sheathing.
Step 3 apply adhesive.
The strips should always be horizontal.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the.
It not only protects the roof but it also protects the fascia.
Classicbond rubber roofing epdm whether you are a roofing professional or home owner and looking for a flat rubber roofing material that is both sustainable.
Spread the roofing cement along the.
Using a measuring tape measure 35 inches 89 cm up from.
Use a trowel to scoop up the roofing cement.
Drip edge or drip cap is either plastic or sheet metal.
Step by step roll roofing installation 1.
It also helps if you first install a layer of roofing felt.
Install peel and stick roofing in a similar manner.
Remove any loose shingles.
Apply roofing cement to the roof.
Step 2 roll out rubber membrane.