Properly fasten panels including fastening and spacing hints step 4.
Installing zip roof sheathing.
This means that you don t need to install tar paper or synthetic underlayment over the roof sheathing before installing the roofing.
Document share indoor air quality evaluation of zip system sheathing.
Ventilate the roof according to current building codes.
This technical tip discusses the results of the voluntary third party testing of voc emissions from zip system sheathing.
Installation manual zip system sheathing and tape.
Zip system wall sheathing installation manual flangedwindows 1.
A sidebar explains how zip r sheathing can be used as a nail base panel over existing roof sheathing.
Zip system roof sheathing zip system wall sheathing advantech subfloor adhesive zip system r sheathing installation manuals bim library view all results.
Ensure the roofing surface is free from oil chemicals sawdust dirt tools electric cords air hoses clothing and anything else that might create a tripping hazard.
Taped zip panels qualify as roof underlayment in most cases.
Zip system roof assembly combines our revolutionary integrated sheathing and flashing tape or liquid flashing to provide a sealed roof for protection against moisture intrusion during construction or if high winds strip the roof covering away.
Also use more nails and place them closer together to build a stronger roof.
Installing zip system sheathing in a roof application.
Do not wear footwear with worn soles or heels.
A strong resilient roof is a home s first line of defense when the roof deck is exposed to weather.
And scroll down to see more details on each with installation hints and tips below.
We go in depth on how to install roof sheathing.
Cut a length of zip system tape or another adhesive backedflashingtape mustmeeticc es acceptancecriteriaforflashingmaterials ac148.
The exceptions are where the local building code or roof covering manufacturers require a membrane type underlayment.
Check the nailing surface is level.
Starting with how to place the first row of sheathing we cover fastening methods the use of h clips stagg.
Cover sheathing with shingle underlayment felt.
Our easy to install zip system sheathing and tape streamlines the weatherization process that delivers moisture and air protection with a water and air barrier.
Install temporary toe boards along the zip system sheathing roof surface.