The siding must be installed over a flat surface so unless you re siding a new home or have removed the old lap siding you ll need to line the wall with sheets of rigid foam board usually 1 2.
Is siding installed top down.
Slide the zip tool under the butt edge of the siding hook the locking edge and pull down.
The bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
Before you install your shiplap boards open your boxes and let the flooring adjust to the room temperature and moisture for at least 48 hours.
Most suppliers sell two sizes of starter 2 1 2 in.
If panel is uncut or cut down in the v shaped groove of a piece of vertical siding simply insert it into a 3 8 9 5mm j channel locking the other side on to the previously applied panel.
Aluminum siding is installed in an interlocking pattern where the upper edge of each piece has a flange for nails which also has a lip like a backward upside down j that serves as the locking.
Then slide the tool horizontally along the lock to release it.
The siding can be installed both vertical or horizontal.
The first step in your shiplap accent wall is to remove everything from the wall including any nails use a putty knife to gently pry and remove baseboards crown moulding and trim.
If horizontal the tongue is usually on the top to avoid water retention amp.
Below the top of the foundation but the lower the vinyl siding is installed the better.
It protects the sheathing from rain snow and pests.
Remove wall plates and outlet covers.
As you stated the vapor barrier is of primary concern.
A furring strip should be installed to prevent panel detachment.
This siding can be used both for interior wood rooms.
Install the top row of siding.
To determine how much you will need to cut from the top of the panel measure the distance between the top of the under sill trim and the lock on the next panel down then subtract 1 4 inch 0 6 cm.
I would remove the siding down to the barrier and then approach the brick facade installation as it would normally be done the right way depending on the material being used and how the manufacturer specifies.
Draw a line on the wall along the top of each siding course before you pull the nails.
Spend the extra few bucks on the wider stuff and start your siding a bit lower.